UL
1030
SHEATHED HEATING ELEMENT
TESTING STANDARDS |
|
1.POWER
DEVIATION:
|
|
Rated voltage electricity to its power deviation can not
exceed the following table |
|
|
Rated input power(W)
|
Deviation
|
|
25<W≦200
|
±10%
|
|
W>200
|
+deviation:+5%或20W
(comes
to large)
,-deviation:-10%
|
|
|
2.
Insulation material thickness: |
|
2-1.Voltage
of 300V(With)
the following,0.41
mm
MIN. |
|
2-2.Voltage of 300 V (with) more,0.79
mm
MIN. |
|
3.
Drive a wedge between distance |
|
3-1.Voltage
of 300V(With)
the following,1.6
mm
MIN. |
|
3-2.Voltage of 300 V (with) more,6.4
mm
MIN. |
|
|
4.LC
TEST |
|
4-1.To
1.15 times the rated power electricity to HTR surface temperature
stable, single
|
|
5.Humidity-resistant test |
|
5-1.After 60 days
humidfastness test, humidfastness conditions: 85 ± 5% RH, 32 ± 2 ℃ |
|
5-2.Humidity-resistant
test electricity capacity in accordance with the regulations
HTR-
|
|
6.Life test |
|
6-1.
Rated voltage of
electricity voltage of 108%. |
|
6-2.Cycle
power:60 min. ON
20 min. OFF 1000cycle |
|
6-3.Life
after the test HTR, need to test leakage current test methods with
4-1. |
|
6-4.
Life after the test HTR, leakage current tests, the testing
insulation (hot), the
|
|
6-5.
Life after the test HTR, leakage current tests, the test
pressure (hot), the pressure
|